|
|
|
Location: Lamphun, Thailand
Client: SUS Corp.
Site Area: 250,000sqm
Budget: 12,000,000 USD for 1st phase
Contractor: Thai TODA Corporation ltd.
Concept Designer: Takuya Onishi / Launchpad05
Cons-Drawing: Urban Formative Architect and Associates
Photo: Ikuhiro Iwamoto/i2 inc and Takuya Onishi
Aluminium factory is covered by computer programmed movable louver. Each louver is 6m long, it continues 90m (15 units of the louver system) to cover both sides of gigantic factory. The movable louver functions as climate adjuster in tropical weather. Main circulation and Factory floor level is lifted up to 3m, for avoiding flooding. Floating office space gives good supervision with clear visual for production flow. |
|
 |